IJRR

International Journal of Research and Review

| Home | Current Issue | Archive | Instructions to Authors | Journals |

Research Paper

Year: 2023 | Month: January | Volume: 10 | Issue: 1 | Pages: 304-314

DOI: https://doi.org/10.52403/ijrr.20230133

Analyzing of Project Delivery Risks in Highway Construction During the Covid-19 Pandemic

Ismail Nur Ariyanto1, Mawardi Amin2

1,2Master of Civil Engineering Department, Universitas Mercu Buana, Jakarta 11650 Indonesia

Corresponding Author: Ismail Nur Ariyanto

ABSTRACT

The Covid-19 pandemic has hit all sectors of the business world, and the construction sector is no exception, resulting in delays, loss of efficiency, and cost impacts due to Covid-19 and the response to related government regulations, there is little or no precedent to help contractor companies understand what the potential impacts are. Covid-19 in the future and construction program when the lockdown begins. However it is very likely that work will need to be stopped due to health and safety concerns. Even if the project does not stop altogether, it is likely to be more expensive and take more time. This study attempts to conduct a risk assessment of project delivery with the most popular system, to see risk factors and then analyze risk factor ratings at all stages of project implementation until construction handover. The Covid-19 pandemic can be said to be a new phenomenon that has not much literature, so the identification of risk factors using a literature review was validated by expert discussion method, assessment by probability and impact, while the analytical method used the Analytical Hierarchy Process (AHP) approach. The results of dominant and major priority of risks including construction work health and safety, delay in delivery schedule, delays in procuring materials, labor, and equipment and delay in certification of bills.

Keywords: Pandemic Covid-19 · Risk · Project · Highway Construction

[PDF Full Text]